Lakeside park Bratislava

Park One Bratislava

Tower 115 Bratislava

Westend Squre Bratislava

A convenient location, excellent infrastructure and availability of parking spaces make the Westend Square Business Center an excellent place for doing your business. A few years ago, the Hasil Company took part in construction of the first part in this complex called the Westend Tower. Construction of the second part of the complex, the Westend Sguare, began three years ago but it was hindered by the economic crisis and the project came to halt. Last year, the project started up again thus giving an opportunity to supply fire closures to the JT Company, our old strategic business partner. Our company was successful not only because we were selected from the midst of a fierce competition, but also because we are a healthy and prosperous company that is a part of the multinational Mercor Group. First fireproof and non-fireproof closures were delivered in July, 2011 and the last ones in September, 2011. Fire resistant doors and walls were mostly placed in an elevator lobby where they separate offices from technical areas. Also subterranean closures were added. Total surface area of mostly aluminium structures was 590 m² and total surface area of steel doors was 520 m². Because of the overall volume of work and products provided for these buildings, the Hasil Company has been ranked among the strategic constructions made this year. Currently, the third part of the complex, named the Westend Quadrant Fitout, is being planned and on which we are already working with the project engineers.

AB SCP Ružomberok

Europa Bussines center Banská Bystrica

Omnipolis Bratislava

Aupark Tower in Kosice

The Aupark Tower of Kosice is a modern office building that will be a part of the Aupark Shopping and Amusement Center. The building complex is located on the Námestí osloboditeľov (Liberation Square), which is right in the center of the second largest city in Slovakia. Delivery and installation of solid smooth partially glazed steel doors took place from March to December, 2011, which had a total surface area of 185m2. The following items were supplied:

  • Solid smooth steel single and double doors with fire resistance EI30/D1C ~ EW90/D1C,
  • Partially glazed steel single doors with fire resistance S/C were placed in connecting hallways and
  • Solid partially glazed steel/stainless and all-stainless single and double doors without fire resistance EI60D1/C were designed for the elevator (lift) lobby.
The following were specially designed and delivered for this project:
  • Partially glazed all-stainless double doors without flap strip with stainless panic metalwork.
The HB REAVIS Company was a contractual partner.